Sixteenth meeting of the GCF Board (B.16)
Songdo, Incheon, Republic of Korea
4–6 Apr 2017
B.16
Documents
-
Report of the sixteenth meeting of the Board, 4-6 April 2017
- Meeting report
- GCF/B.16/24
-
Decisions of the Board – sixteenth meeting of the Board, 4 – 6 April 2017
- Compendium of decisions
- GCF/B.16/23
-
Provisional Agenda
- Agenda
- GCF/B.16/01/Drf.01
-
Provisional agenda
- Agenda
- GCF/B.16/01/Drf.02
-
Agenda of the sixteenth meeting of the Board
- Agenda
- GCF/B.16/01
-
Report on the activities of the Co-Chairs
- Action item
- GCF/B.16/02
-
Implementation of the initial strategic plan of the GCF: annual report
- Action item
- GCF/B.16/04
-
Implementation of the initial Strategic Plan of the GCF – Addendum I: Update on country programmes and entity work programmes
- Action item
- GCF/B.16/04/Add.01
-
Guidelines for Enhanced Country Ownership and Country Drivenness
- Action item
- GCF/B.16/06
-
Funding proposal package for FP038
- Action item
- GCF/B.16/07/Add.01/Rev.01
-
Consideration of funding proposals
- Action item
- GCF/B.16/07
-
Funding proposal package for FP039
- Action item
- GCF/B.16/07/Add.02
-
Funding proposal package for FP040
- Action item
- GCF/B.16/07/Add.03
-
Funding proposal package for FP041
- Action item
- GCF/B.16/07/Add.04
-
Funding proposal package for FP042
- Action item
- GCF/B.16/07/Add.05
-
Funding proposal package for FP043
- Action item
- GCF/B.16/07/Add.06
-
Funding proposal package for FP044
- Action item
- GCF/B.16/07/Add.07
-
Funding proposal package for FP045
- Action item
- GCF/B.16/07/Add.08
-
Funding proposal package for FP046
- Action item
- GCF/B.16/07/Add.09
-
Independent Technical Advisory Panel’s assessment
- Action item
- GCF/B.16/07/Add.13
-
Response from the accredited entities to the Independent Technical Advisory Panel assessment
- Action item
- GCF/B.16/07/Add.16
-
Gender assessments and action plans
- Action item
- GCF/B.16/07/Add.17
-
Report on the status of the staffing of the Secretariat
- Action item
- GCF/B.16/11
-
Competitive process for the selection of the Trustee
- Action item
- GCF/B.16/12
-
Status of accreditation matters
- Action item
- GCF/B.16/13
-
Interim work plan and interim budget of the Independent Evaluation Unit
- Action item
- GCF/B.16/18
-
Report on the execution of the 2016 administrative budget of the GCF and the 2016 unaudited financial statements
- Action item
- GCF/B.16/19
-
Updated terms of reference of the Independent Redress Mechanism
- Action item
- GCF/B.16/20
-
Adjusted administrative budget and work programme of the Secretariat for 2017
- Action item
- GCF/B.16/21
-
Work programme of the Secretariat for 2017 and adjusted administrative budget
- Action item
- GCF/B.16/21/Rev.01
-
Date and venue of the following meetings of the Board
- Action item
- GCF/B.16/22
-
Annotations to the provisional agenda
- Information
- GCF/B.16/Inf.01
-
Decisions taken between the fifteenth and sixteenth meetings of the Board
- Information
- GCF/B.16/Inf.02
-
Decisions taken between the fifteenth and sixteenth meetings of the Board – Addendum
- Information
- GCF/B.16/Inf.02/Add.01
-
Report on the activities of the Secretariat
- Information
- GCF/B.16/Inf.03
-
Reports from committees, panels and groups of the Board of the Green Climate Fund
- Information
- GCF/B.16/Inf.04
-
Reports from committees, panels and groups of the Board of the Green Climate Fund – Addendum
- Information
- GCF/B.16/Inf.04/Add.01
-
Reports from committees, panels and groups of the Board of the Green Climate Fund - Addendum II
- Information
- GCF/B.16/Inf.04/Add.02
-
Progress and outlook report of the Readiness and Preparatory Support Programme
- Information
- GCF/B.16/Inf.05
-
Status of the GCF portfolio: pipeline and approved projects
- Information
- GCF/B.16/Inf.06
-
Status of the fulfilment of conditions on relevant approved projects
- Information
- GCF/B.16/Inf.07
-
Facilitating an increase in proposals from direct access entities
- Information
- GCF/B.16/Inf.08
-
Status of the Initial Resource Mobilization process
- Information
- GCF/B.16/Inf.10
-
Matters related to the replenishment of the Green Climate Fund
- Information
- GCF/B.16/Inf.11
-
Update on matters related to Risk
- Information
- GCF/B.16/Inf.12
-
Matters related to accreditation framework and policy: Report of the Accreditation Committee
- Information
- GCF/B.16/Inf.13
-
Submissions following the call for public submissions on the updated Terms of Reference of the Independent Redress Mechanism
- Information
- GCF/B.16/Inf.14
-
Update on progress in addressing guidance from the twenty-second session of the Conference of the Parties
- Information
- GCF/B.16/Inf.15
Meeting agenda
- Opening of the meeting 1
- Adoption of the agenda and organization of work 2
- Adoption of the report of the fifteenth meeting of the Board 3
- Decisions proposed and approved between the fifteenth and sixteenth meetings of the Board 4
- Report on the activities of the Co-Chairs, including the outcomes of the Co-Chairs’ consultations 5
- Report on the activities of the Secretariat 6
- Reports from committees, panels and groups 7
- Implementation of the initial strategic plan for the GCF 8
- Work programme of the Secretariat for 2017 9
- Matters related to guidance from the Conference of the Parties 10
- Update on progress in addressing guidance from the Conference of the Parties 10.a
- Facilitating an increase in proposals from direct access entities 10.b
- Readiness and preparatory support 11
- Progress report on the Readiness and Preparatory Support Programme 11.a
- Terms of reference for the independent evaluation of the Readiness and Preparatory Support Programme 11.b
- Country ownership guidelines 11.c
- Status of the GCF portfolio: Pipeline and approved projects 12
- Policy matters related to the approval of funding proposals 13
- Status of the fulfilment of conditions on relevant approved projects 13.a
- Review of the initial proposal approval process 13.b
- Simplified approval process 13.c
- Policy matters arising from the consideration of funding proposals at the fifteenth meeting of the Board 13.d
- Approval of funding proposals 14
- Private Sector Facility: Potential approaches to mobilizing funding at scale 15
- Status of the staffing of the Secretariat 16
- Status of resources of the Initial Resource Mobilisation period 17
- Competitive process for the selection of the Permanent Trustee 18
- Policies on the formal replenishment process 19
- Update on the GCF risk management framework 20
- Matters related to accreditation 21
- Status of accreditation matters 21.a
- Update on matters related to accreditation framework and policy 21.b
- Accreditation master agreements 21.c
- Fiduciary compliance policies 21.d
- Performance review of the members of the Accreditation Panel 21.e
- Performance criteria and measurement procedures for Board-appointed officials 22
- Interim work plan and interim budget of the Independent Evaluation Unit 23
- Updated terms of reference for the Independent Redress Mechanism 24
- Administrative matters 25
- Report on the execution of the administrative budget of the GCF as at 31 December 2016 and the 2016 unaudited financial statement of the GCF 25.a
- Adjusted administrative budget for 2017 25.b
- Updates on the revised administrative guidelines 25.c
- Dates and venues of the following meetings of the Board 26
- Other matters 27
- Report of the meeting 28
- Close of the meeting 29
Decisions
-
Work programme of the Secretariat for 2017
B.16/01The Board, having considered document GCF/B.16/21/Rev.01 titled “Work programme of the Secretariat for 2017 and adjusted administrative budget”:
- Recognizes that the work programme of the Secretariat for 2017 will help to guide the activities and structure of the Secretariat;
- Approves the priorities set out in the work programme of the Secretariat for 2017, in accordance with paragraph 23(e) of the Governing Instrument for the GCF;
- Requests the Secretariat to provide a detailed and updated work plan for the Readiness and Preparatory Support Programme and to report on the progress made in its implementation at each Board meeting for the Board’s information; and
- Approves the adjusted administrative budget for the period of 1 January to 31 December 2017, making the total approved administrative budget for fiscal year 2017 USD 46,784,071, recognizing that this increase is on an exceptional basis and does not establish a new standard budget level for items, including contractual services.
-
Approval of funding proposals
B.16/02The Board, having considered document GCF/B.16/07 titled “Consideration of funding proposals”:
- Takes note of the following funding proposals:
- Funding proposal 038 titled “GEEREF NeXt” by the European Investment Bank, as contained in document GCF/B.16/07/Add.10/Rev.02;
- Funding proposal 039 titled “GCF-EBRD Egypt renewable energy financing framework” by the European Bank for Reconstruction and Development, as contained in document GCF/B.16/07/Add.11/Rev.01;
- Funding proposal 040 titled “Tajikistan: scaling up hydropower sector climate resilience” by the European Bank for Reconstruction and Development, as contained in document GCF/B.16/07/Add.01 and 15;
- Funding proposal 041 titled “Simiyu climate resilience project” by KfW Bankengruppe, as contained in document GCF/B.16/07/Add.02 and 15;
- Funding proposal 042 titled “Irrigation development and adaptation of irrigated agriculture to climate change in semi-arid Morocco” by Agence Française de Développement, as contained in document GCF/B.16/07/Add.03 and 15;
- Funding proposal 043 titled “The Saïss water conservation project” by the European Bank for Reconstruction and Development, as contained in document GCF/B.16/07/Add.04 and 15;
- Funding proposal 044 titled “Tina river hydropower development project” by the World Bank, as contained in document GCF/B.16/07/Add.05 and 15;
- Funding proposal 045 titled “Ground water recharge and solar micro irrigation to ensure food security and enhance resilience in vulnerable tribal areas of Odisha” by the National Bank for Agriculture and Rural Development, as contained in document GCF/B.16/07/Add.06 and 15; and
- Funding proposal 046 titled “Responding to the increasing risk of drought: building gender-responsive resilience of the most vulnerable communities” by the United Nations Development Programme, as contained in document GCF/B.16/07/Add.07 and 15;
- Approves funding proposal 038 for the amount of USD 265,000,000, submitted by the European Investment Bank, subject to the conditions set out in annex I and in the term sheet set out in document GCF/B.16/07/Add.10/Rev.02;
- Also approves funding proposal 039 for the amount of USD 154,700,000, submitted by the European Bank for Reconstruction and Development, subject to the conditions set out in annex I and in the term sheet set out in document GCF/B.16/07/Add.11/Rev.01;
- Further approves funding proposal 040 for the amount of USD 50,000,000, submitted by the European Bank for Reconstruction and Development, subject to the conditions set out in annex I and in the respective term sheet set out in document GCF/B.16/07/Add.15;
- Approves funding proposal 041 for the amount of EUR 102,700,000, submitted by KfW Bankengruppe, subject to the conditions set out in annex I and in the respective term sheet set out in document GCF/B.16/07/Add.15;
- Also approves funding proposal 042 for the amount of EUR 20,000,000, submitted by Agence Française de Développement, subject to the conditions set out in annex I and in the respective term sheet set out in document GCF/B.16/07/Add.15;
- Further approves funding proposal 043 for the amount of EUR 31,970,000, submitted by the European Bank for Reconstruction and Development, subject to the conditions set out in annex I and in the respective term sheet set out in document GCF/B.16/07/Add.15;
- Approves funding proposal 044 for the amount of USD 86,000,000, submitted by the World Bank, subject to the conditions set out in annex I and in the respective term sheet set out in document GCF/B.16/07/Add.15, except for clause 20, Terms and Conditions Applicable to the GCF Loan;
- Mandates the Secretariat, for funding proposal 044, to finalize prior to the execution of the funded activity agreement, the terms and conditions of the loan component in a manner consistent with the following terms pursuant to decision B.09/04:
- 50 per cent high concessional loan; and
- 50 per cent low concessional loan;
- Approves funding proposal 045 for the amount of USD 34,357,000, submitted by the National Bank for Agriculture and Rural Development, subject to the conditions set out in annex I and in the respective term sheet set out in document GCF/B.16/07/Add.15;
- Decides that there was no consensus to approve funding proposal 046;
- Requests the Secretariat to assess the conditions set out in annex I and, in the event any such condition is considered by the Secretariat to be inconsistent with GCF policies, the Secretariat shall make a recommendation to the Board for further guidance and pending such guidance, the relevant condition shall be deemed not to apply;
- Decides that if the conditions to be met prior to the execution or for the effectiveness of the funded activity agreement to be entered into in respect of each funding proposal have not been fulfilled within the time frames set out in annex I or the respective term sheet, the approval of such funding proposals shall be subject to reconsideration by the Board;
- Requests the Secretariat to prepare a report on the conditions and time frames of all projects approved by the Board and the status of implementation for consideration by the Board no later than its eighteenth meeting;
- Reaffirms that pursuant to annex VII to decision B.07/03 (annex VII to document GCF/B.07/11), the Executive Director or his designee is authorized to negotiate and enter into legal agreements on behalf of the GCF with accredited entities and other parties involved in respect of funding proposals approved by the Board, taking into account any condition approved by the Board in this decision and in the decision accrediting the relevant accredited entity; and
- Authorizes the Secretariat to disburse fees for each funded project/programme approved by the Board as per the disbursement schedule to be agreed in the funded activity agreement in accordance with the interim policy on fees for accredited entities adopted by the Board pursuant to decision B.11/10.
- Takes note of the following funding proposals:
-
Private Sector Facility: potential approaches to mobilizing funding at scale
B.16/03A limited distribution decision was adopted under this agenda item:
DECISION B.16/03 on potential approaches to mobilizing funding at scale.
-
Status of the staffing of the Secretariat
B.16/04The Board, having considered document GCF/B.16/11 titled “Report on the status of the staffing of the Secretariat”:
Notes the contents of the report.
-
Competitive process for the selection of the Permanent Trustee
B.16/05The Board, having considered document GCF/B.16/12 titled “Competitive procedure for the selection of the Trustee”:
- Establishes the ad hoc Trustee Selection Committee as an ad hoc committee of the Board in accordance with paragraphs 2(g) and 30 of the Rules of Procedure of the Board;
- Adopts the terms of reference of the ad hoc Trustee Selection Committee as set out in annex II;
- Appoints the following four members of the Board to the ad hoc Trustee Selection Committee:
- Mr. Omar El-Arini;
- Mr. Zaheer Fakir;
- Mr. Larry McDonald; and
- Mr. Mikio Mori; and
- Requests the ad hoc Trustee Selection Committee, with the support of the Secretariat, to convene immediately to begin its work.
-
Matters related to accreditation: Accreditation master agreements
B.16/06A limited distribution decision was adopted under this agenda subitem:
DECISION B.16/06 on accreditation master agreements.
-
Interim work plan and interim budget of the Independent Evaluation Unit
B.16/07The Board having considered document GCF/B.16/18 titled “Interim work plan and interim budget of the Independent Evaluation Unit”:
- Approves the work plan and budget of the Independent Evaluation Unit for March to June, 2017 as contained in document GCF/B.16/19 and annex III (total budgeted amount of USD 370,930), respectively;
- Authorizes the Head of the Independent Evaluation Unit to undertake consultations as required to present a complete work plan and budget for 2017 at the seventeenth meeting of the Board; and
- Also authorizes the Head of the Independent Evaluation Unit to undertake consultations to inform the outline of the Independent evaluation policy and undertake processes to set up the Independent Evaluation Unit.
-
Dates and venues of the following meetings of the Board
B.16/08The Board, having reviewed document GCF/B.16/22 titled “Date and venue of the following meetings of the Board”:
- Confirms that the seventeenth meeting of the Board will take place in Songdo, Incheon, Republic of Korea, from Tuesday, 4 July 2017, to Thursday, 6 July 2017;
- Decides that the eighteenth meeting of the Board will take place in the Arab Republic of Egypt from Tuesday, 3 October 2017, to Thursday, 5 October 2017, with these dates and the venue to be confirmed at the seventeenth meeting of the Board; and
- Requests the Secretariat to initiate consultations with the host country, with the aim of finalizing the memorandum of understanding for the hosting of a Board meeting before the seventeenth meeting of the Board.
-
B.16: Opening of the meeting
1. 04 Apr 2017 09:02 - 09:10 Download1. B.16: Opening of the meeting -
B.16: Adoption of the agenda and organization of work
2. 04 Apr 2017 09:13 - 09:20 Download2. B.16: Adoption of the agenda and organization of work -
B.16: Adoption of the report of the fifteenth meeting of the Board
3. 04 Apr 2017 09:18 - 09:28 Download3. B.16: Adoption of the report of the fifteenth meeting of the Board -
B.16: Decisions proposed and approved between the fifteenth and sixteenth meetings of the Board
4. 04 Apr 2017 09:29 - 09:31 Download4. B.16: Decisions proposed and approved between the fifteenth and sixteenth meetings of the Board -
B.16: Report on the activities of the Co-Chairs, including the outcomes of the Co-Chairs’ consultations
5. 04 Apr 2017 09:31 - 09:32 Download5. B.16: Report on the activities of the Co-Chairs, including the outcomes of the Co-Chairs’ consultations -
B.16: Report on the activities of the Secretariat
6. 04 Apr 2017 09:32 - 09:43 Download6. B.16: Report on the activities of the Secretariat -
B.16: Reports from committees, panels and groups
7. 04 Apr 2017 09:44 - 10:36 Download7. B.16: Reports from committees, panels and groups -
B.16: Implementation of the initial strategic plan for the GCF [part 1]
8. 04 Apr 2017 10:36 - 11:13 Download8. B.16: Implementation of the initial strategic plan for the GCF [part 1] -
B.16: Implementation of the initial strategic plan for the GCF [part 2]
8. 06 Apr 2017 14:29 - 14:48 Download8. B.16: Implementation of the initial strategic plan for the GCF [part 2] -
B.16: Work programme of the Secretariat for 2017
9. 04 Apr 2017 11:53 - 12:59 Download9. B.16: Work programme of the Secretariat for 2017 -
B.16: Update on progress in addressing guidance from the Conference of the Parties
10.A. 05 Apr 2017 16:15 - 16:16 Download10.A. B.16: Update on progress in addressing guidance from the Conference of the Parties -
B.16: Facilitating an increase in proposals from direct access entities
10.B. 05 Apr 2017 16:17 - 17:24 Download10.B. B.16: Facilitating an increase in proposals from direct access entities -
B.16: Progress report on the Readiness and Preparatory Support Programme
11.A. 05 Apr 2017 15:34 - 16:09 Download11.A. B.16: Progress report on the Readiness and Preparatory Support Programme -
B.16: Terms of reference for the independent evaluation of the Readiness and Preparatory Support Programme
11.B. 05 Apr 2017 16:09 - 16:12 Download11.B. B.16: Terms of reference for the independent evaluation of the Readiness and Preparatory Support Programme -
B.16: Country ownership guidelines
11.C. 05 Apr 2017 16:12 - 16:14 Download11.C. B.16: Country ownership guidelines -
B.16: Status of the GCF portfolio: Pipeline and approved projects
12. 04 Apr 2017 14:05 - 15:12 Download12. B.16: Status of the GCF portfolio: Pipeline and approved projects -
B.16: Approval of funding proposals [part 1]
14. 04 Apr 2017 15:13 - 17:55 Download14. B.16: Approval of funding proposals [part 1] -
B.16: Approval of funding proposals [part 2]
14. 05 Apr 2017 09:15 - 14:22 Download14. B.16: Approval of funding proposals [part 2] -
B.16: Approval of funding proposals [part 3]
14. 06 Apr 2017 13:37 - 14:18 Download14. B.16: Approval of funding proposals [part 3] -
B.16: Approval of funding proposals [part 4]
14. 06 Apr 2017 15:19 - 15:35 Download14. B.16: Approval of funding proposals [part 4] -
B.16: Approval of funding proposals [part 5]
14. 06 Apr 2017 16:06 - 18:02 Download14. B.16: Approval of funding proposals [part 5] -
B.16: Status of the staffing of the Secretariat
16. 05 Apr 2017 17:25 - 18:03 Download16. B.16: Status of the staffing of the Secretariat -
B.16: Status of resources of the Initial Resource Mobilisation period
17. 06 Apr 2017 09:24 - 09:41 Download17. B.16: Status of resources of the Initial Resource Mobilisation period -
B.16: Competitive process for the selection of the Permanent Trustee [part 1]
18. 04 Apr 2017 11:15 - 11:36 Download18. B.16: Competitive process for the selection of the Permanent Trustee [part 1] -
B.16: Competitive process for the selection of the Permanent Trustee [part 2]
18. 05 Apr 2017 09:09 - 09:14 Download18. B.16: Competitive process for the selection of the Permanent Trustee [part 2] -
B.16: Competitive process for the selection of the Permanent Trustee [part 3]
18. 06 Apr 2017 14:21 - 14:31 Download18. B.16: Competitive process for the selection of the Permanent Trustee [part 3] -
B.16: Status of accreditation matters
21.A. 06 Apr 2017 09:41 - 09:42 Download21.A. B.16: Status of accreditation matters -
B.16: Interim work plan and interim budget of the Independent Evaluation Unit
23. 06 Apr 2017 09:43 - 10:08 Download23. B.16: Interim work plan and interim budget of the Independent Evaluation Unit -
B.16: Updated terms of reference for the Independent Redress Mechanism
24. 06 Apr 2017 10:08 - 10:40 Download24. B.16: Updated terms of reference for the Independent Redress Mechanism -
B.16: Adjusted administrative budget for 2017
25.B. 06 Apr 2017 14:34 - 14:53 Download25.B. B.16: Adjusted administrative budget for 2017 -
B.16: Dates and venues of the following meetings of the Board
26. 06 Apr 2017 10:42 - 11:03 Download26. B.16: Dates and venues of the following meetings of the Board